The project consisted of three buildings totaling 115,000 gross square feet on a fifteen-acre site. The buildings will be the headquarters of five battalions of the 4th Psychological Operations Group.

The main, or Battalion Headquarters building, is divided into five pods and contains administrative, clerical, conference and classroom space for each of the battalions.
All of the pods in the Battalion Headquarters building are linked by a main corridor that spans the entire 430-foot length of the building. The corridor is approximately 33 feet tall at its highest point, and is pierced by two levels of steel framing.

The two Company Headquarter buildings house the office, operations, and equipment storage areas for the enlisted personnel in each of the five battalions. The site features a 1,300-foot long modular retaining wall system that rises to over 13 feet high.

CLIENT
U.S. Army Corps of Engineers, Savannah, Georgia District

FACILITY TYPE
115,000 sf complex battalion headquarters and company headquarters

CONSTRUCTED VALUE

$14.7 million

ARCHITECTS
Cromwell Architects-Engineers
 
 


©2004 B.L .Harbert International, LLC - All Rights Reserved
| contact us | privacy policy |